CaseHome > News
ASTM A 53 Grade B Steel pipe production process
The ASTM A53 Grade B steel pipe production process typically includes the following steps:
1. Raw material preparation: the carbon steel coil that meets the standard requirements is selected as the raw material.
2. Cold rolling: the coil is cold rolled to form a round steel pipe.
3. Welding: The steel plate is welded by high-frequency induction welding or resistance welding to form a seamless joint.
4. Heat treatment: Heat treatment of welded ASTM A53 Grade B steel pipe to eliminate residual stress and improve mechanical properties.
5. Cold drawing: the heat-treated ASTM A53 Grade B steel pipe is cold-drawn to further improve the dimensional accuracy and surface finish.
6. Cutting: Cut the ASTM A53 Grade B steel pipe to the required length according to the requirements.
7. Surface treatment: Clean the surface of ASTM A53 Grade B steel pipe, anti-corrosion coating, etc., to ensure surface quality.
8. Inspection: Test the size, chemical composition, mechanical properties and other aspects of ASTM A53 Grade B steel pipe to ensure that product quality meets the requirements of the standard.
9. Packaging: According to the requirements of the specification, the ASTM A53 Grade B steel pipe is properly packaged to ensure that it is not damaged during transportation.
The above steps are common in the production of ASTM A53 Grade B steel pipe, and the specific production process may vary by manufacturer and equipment.
WE PROVIDE
- GB/T9711-2011 PSL1 LSAW Pipeline
- GB/T9711-2011 PSL2 LSAW Pipeline
- ISO3183 PSL1 LSAW Pipeline
- ISO3183 PSL2 LSAW Pipeline
- API 5L PSL1 LSAW Pipeline
- API 5L PSL2 LSAW Pipeline
- EN10219 LSAW Pipeline
- ASTM A671 LSAW Pipeline
- ASTM A672 LSAW Pipeline
- ASTM A252 Welded and Seamless steel pipe piles
- ASTM A53 Welded and seamless steel pipe
- GB/T3091-2008 welded steel pipes for low pressure
- GB/T13793-2008 LSAW Pipeline